FANDOM


The Duty Shift Log is a document.

It is found in the transportation section of the Jupiter plant.

Contents Edit

The document contains the following text: "...18:30 - airtight sealing of all P-1 underpass sections complete. 19:00 - airtight sealing of railroad lock doors complete. Welding had to be used to seal the doors. Operation of the lock door mechanism required the activation of the backup generator, because the power to the underpass had already been cut. 20:00 - the chemical workshop has initiated flooding of the underpass with gas. 22:00 - work to seal the underpass has been completed, with all documents sent to Department 1."

Notes Edit

  • The document weighs 0.05 kg.

Ad blocker interference detected!


Wikia is a free-to-use site that makes money from advertising. We have a modified experience for viewers using ad blockers

Wikia is not accessible if you’ve made further modifications. Remove the custom ad blocker rule(s) and the page will load as expected.